Water Corporation of Western Australia (Water Corp), the principal supplier of water and wastewater services to WA, is upgrading the West Pilbara Water Supply Scheme (WPWSS) as part of the Bungaroo Water Source Integration project

PowerEarth Technologies Pty Ltd are acting as professional and technical consultants in conjunction with GHD to perform a pipeline hazard analysis study for this pipeline upgrade, which will include an Low Frequency Induction study; also referred to as an AC Interference Study (ACIS) to ascertain what, if any, the effect of nearby electrical assets on the pipeline.  A mitigation design study was also performed where necessary, along with a booster pump upgrade earthing system design.

This project was scheduled for delivery in early 2014.